鐵路物流中心設(shè)計(jì)規(guī)范(Q/CR9133-2016 英文版)
定 價(jià):700 元
- 作者:中國鐵路總公司 編
- 出版時(shí)間:2016/1/1
- ISBN:9787113240905
- 出 版 社:中國鐵道出版社
- 中圖法分類:U291.5-65
- 頁碼:94
- 紙張:膠版紙
- 版次:1
- 開本:16開
This Code is prepared according to Notice of CHINA RAILWAY on Issuing the Development Plan of Railway Engineering and Construction Standards in 2015 (Document TZJSH [2015] No.313).
This Code is prepared based on the practical experience in the construction and operation of railway freight facilities in China,following the development concept that the railway enterprises shall carry out all categories of logistics activities,provide whole-process services,conduct all-round operation and perform overall-process management, taking into consideration the technical characteristics of railway logistics center,and referring to the experience and practice of social logistics enterprises, so that the railway logistics centers could be integrated into the logistics system of the whole society9 so as to meet the requirement to transform the railway freight to modern logistics and to make the design of railway logistics center meet the requirements forsafety,applicability,advanced technology,convenience,high efficiency,quality service and economic rationality.
The Code consists of 19 chapters:General Provisions,Terms and Abbreviations,Classification and Site Selection,Logistics Demand and Function Setting,Logistics Organization,General Layout, Railway Receiving-departure Yard and Shunting Yard,Container Functional Area,Bulky Goods Functional Area,Packaged Goods Functional Area,Commodity Automobile Functional Area,Goods in Bulk Functional Area, Warehousing and Distribution Functional Area, Dangerous Goods Functional Area, Refrigeration Functional Area, Other Functional Areas, Logistics Equipment,Information System,and Supporting Facilities and Equipment.
We would be grateful if anyone finding the inaccuracy or ambiguity while using this Code would inform us and address the comments to The Third Railway Survey and Design Institute Group Corporation (No.10, Zhongshan Road, Hebei District, Tianjin 3001429 China) and China Railway Economic and Planning Research Institute (No.29B Beifengwo Road, Haidian District, Beijing 100038,China) for the reference of future revisions.
The Construction Management Department of CHINA RAILWAY is responsible for the interpretation of this Code.
This Code is prepared according to Notice of CHINA RAILWAY on Issuing the Development Plan of Railway Engineering and Construction Standards in 2015 (Document TZJSH [2015] No.313).
This Code is prepared based on the practical experience in the construction and operation of railway freight facilities in China,following the development concept that the railway enterprises shall carry out all categories of logistics activities,provide whole-process services,conduct all-round operation and perform overall-process management, taking into consideration the technical characteristics of railway logistics center,and referring to the experience and practice of social logistics enterprises, so that the railway logistics centers could be integrated into the logistics system of the whole society9 so as to meet the requirement to transform the railway freight to modern logistics and to make the design of railway logistics center meet the requirements forsafety,applicability,advanced technology,convenience,high efficiency,quality service and economic rationality.
The Code consists of 19 chapters:General Provisions,Terms and Abbreviations,Classification and Site Selection,Logistics Demand and Function Setting,Logistics Organization,General Layout, Railway Receiving-departure Yard and Shunting Yard,Container Functional Area,Bulky Goods Functional Area,Packaged Goods Functional Area,Commodity Automobile Functional Area,Goods in Bulk Functional Area, Warehousing and Distribution Functional Area, Dangerous Goods Functional Area, Refrigeration Functional Area, Other Functional Areas, Logistics Equipment,Information System,and Supporting Facilities and Equipment.
We would be grateful if anyone finding the inaccuracy or ambiguity while using this Code would inform us and address the comments to The Third Railway Survey and Design Institute Group Corporation (No.10, Zhongshan Road, Hebei District, Tianjin 3001429 China) and China Railway Economic and Planning Research Institute (No.29B Beifengwo Road, Haidian District, Beijing 100038,China) for the reference of future revisions.
The Construction Management Department of CHINA RAILWAY is responsible for the interpretation of this Code.
1 General Provisions
2 Terms and Abbreviations
2.1 Terms
2.2 Abbreviations
3 Classification and Site Selection
4 Logistics Demand and Function Setting
4.1 General Requirements
4.2 Logistics Demand Investigation
4.3 Logistics Demand Prediction
4.4 Function Setting and Selection
5 Logistics Organization
5.1 General Requirements
5.2 Transportation Organization
5.3 Logistics Operation Organization
6 General Layout
6.1 General Requirements
6.2 Plan Layout
6.3 Layout Type of Loading and Unloading Yard
6.4 Track Plan and Profile
6.5 Miscellaneous
7 Railway Receiving-departure Yard and Shunting Yard
7.1 General Requirements
7.2 Number of Station Tracks and Effective Length
8 Container Functional Area
8.1 General Requirements
8.2 Container Transfer Area
8.3 Assistant Storage Area
8.4 Container Stuffing and Unstuffing Yard
9 Bulky Goods Functional Area
9.1 General Requirements
9.2 Operation Area
10 Packaged Goods Functional Area
11 Commodity Automobile Functional Area
12 Goods in Bulk Functional Area.,
13 Warehousing and Distribution Functional Area
14 Dangerous Goods Functional Area
15 Refrigeration Functional Area
16 Other Functional Areas
17 Logistics Equipment
18 Information System
19 Supporting Facilities and Equipment
Words Used for Different Degrees of Strictness